| 000 | 01002nam a2200325Ia 4500 | ||
|---|---|---|---|
| 003 | OSt | ||
| 005 | 20220912150255.0 | ||
| 006 | a|||||r|||| 00| 0 | ||
| 007 | ta | ||
| 008 | 220909b |||||||| |||| 00| 0 eng d | ||
| 020 | _a0831132280 (hbd) | ||
| 024 | _a18485 | ||
| 037 | _b665, 20/03/2006, Vardhman Books | ||
| 037 | _cTextbook | ||
| 040 |
_aCSL _beng _cCSL |
||
| 041 | _aeng | ||
| 082 | _aB2T0b89V, P6 TB | ||
| 100 | _aMoncrief Eugene C | ||
| 245 | 0 | _aProduction spare parts: Optimizing the MRO inventory asset | |
| 260 |
_aNew York Industrial Press, Inc. _c2005 |
||
| 300 |
_axviii, 289p. _ccm. |
||
| 500 |
_aIndex 287-289p. _ccm. |
||
| 650 | _a Inventory control | ||
| 650 | _a Spare parts | ||
| 650 | _aOperational Research | ||
| 700 | _a Reynolds Michael P | ||
| 700 | _a Schroder Ronald M | ||
| 942 |
_hB2T0b89V, P6 TB _cTB _2CC |
||
| 999 |
_c43648 _d43648 |
||